WORK STARTED ON ITF PHASE 2
Works have begun on the second phase of our renovation of the Grade II Listed ITF House project in Borough, London. The stripping back of the building to reveal the existing structure provides insight into the building’s previous development of construction.
.blog-basic-grid-collection-content-wrapper
{
padding-top: 4vw;
pointer-events: none;
}